By Hans De Keulenaer / Published on Tue, 2008-01-08 17:27
The Belgian site being studied in this paper is connected to the public transmission grid (380 kV) by a High Voltage (HV) station. This HV station incorporates a 25 kV substation linked to a second substation via 25 kV underground cables. The second substation supplies the electric installations on the site.
Read full story