What are the requirements for linking an underground section to an overground section? How much land is required?
By HDK / Published on Fri, 2009-11-20 20:24Further reading
The size of the transition/sealing end compound would depend to some extent on the number of cables, but if two circuits of three cables are used, the analogy is more like a “tennis court”; if four cables are used the analogy is more like a “football field”. If the transition compound is placed in a woodland area, it can be easily camouflaged from view. In Denmark, for example, the compounds had to be camouflaged through tree and shrub planting. Today, the transition of a 275 kV line can be housed directly on the last tower, and it may be that, in the near future, the same transition will be available at 400 kV. In a recent CIGRE paper into 400kV cables in rural areas, the six transition compounds were approximately 50x80 metres. These were designed to accommodate two double cable circuits.
Tagged with
Related content
- - What are the main benefits of underground cables?
- - Underground Cables at Extra High Voltage Levels
- - What are the Electro-Magnetic Fields from overhead lines and cables?
- - What are the main differences in outages and repairs for underground power cables?
- - Life cycle costs for extra high voltage cables and overhead lines
People who read this also read
Popular content
- - Checklist for the electrical installation in the home
- - Report - Renewables Support Schemes and Grid Integration Policies
- - Virtual earthing electrode
- - What percentage of which car type (total 100%) do you expect in Europe in 2050? And ditto for 2020 and 2030?
- - Intelligent control of network-connected convertors